Year
Timeline
8 weeks
Location
Munich, Germany

Gallery




The Challenge
01 / 03
ASTIM needed a stand that could accommodate large industrial machines requiring demonstration support. The stand needed strong flooring, carefully planned equipment positioning, and 3‑phase power infrastructure to support heavy equipment and technical presentations.
The Solution
02 / 03
The team behind Maher Design designed a 90 sqm stand with the display of large industrial machines directly inside the stand. Strong flooring, carefully planned equipment positioning, and 3‑phase power infrastructure were integrated to support the heavy equipment. The stand also featured wall‑mounted screens, large graphic panels showing the company’s water and wastewater treatment solutions, and open meeting areas with tables and chairs for technical discussions with visitors and potential partners.
The Results
03 / 03
The final stand successfully combined product showcasing with technical presentation functionality. The large machine displays helped visitors clearly understand ASTIM's engineering capabilities and the scale of its solutions, while the open meeting areas supported effective business discussions throughout the fair.
Exhibited At
ASTIM at IFAT 2026 Munich
Get a Quote
We deliver custom stands across Europe, the Gulf, and Türkiye.



